FULL SERVICE ENVIRONMENTAL CONTRACTING COMPANY
FULL SERVICE ENVIRONMENTAL CONTRACTING COMPANY
JETCO was tasked with removing over 100 tons of contaminated soil and installing a vapor barrier underneath the foundation. We were also responsible for bringing in 400 tons of backfill and compacting it to meet the engineer's requirements. The site was brought to the required grade for a fast food restaurant and parking lot.
JETCO demolished existing well pads and converted large diameter monitoring wells into smaller monitoring wells with reinforced concrete pads & manways.
JETCO provided GPR service to located underground fuel lines. After marking the area, they excavated several test pits for the client on an abandoned site. They exposed the lines and determined they were clean and then restored site back to clients specification.
JETCO provided demolition services of a large in-ground pool that had floated out of the ground. By strategically cutting and removing around 40% of the existing structure, the pool contractor was able to restore the pool back to its usable condition without rebuilding the entire structure.
Copyright © 2015 - 2024 JETCO USA, Inc. - All Rights Reserved.